After gathering all the remaining materials from Home Depot, Zakiya, John, Jason and I began to put the final pieces together and the Rion Antirrion bridge was formed. We started by measuring out the distance for each pylon so it evenly took up the space of the wooden platform. The next step, was to measuring the plastic pieces to fit through the individual pylons. After came the part that was most difficult, we needed to feed the string through the individual holes on the pylons and attached them equidistant to halfway through the length between each pylon. However, after it was all said and done the bridge looked pretty good!

Displaying image1.jpeg
John Cutting Plastic for Roads
Displaying image3.jpeg
Plastic added to Pylons
Displaying image5.jpeg
Tissue Paper Added
Displaying image7.jpeg
Strings Added
Then the during the week the presentations were worked on with the power points, and the final report was finished. All we had left to do was show up with the model and present what we had been working on these past few weeks.